Covid-19

This year, the entire world was faced with another crisis, which this time was caused by the outbreak of the global pandemic COVID-19. The consequences of the virus will affect many more years and are comparable to the Great Depression or the global financial crisis of 2007-2009. According to the Institute for Supply Management report, nearly 95% of enterprises were affected by the Covid-19.

Typical questions

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua

1
1

Lorem ipsum dolor

Whether there are enough employees to fulfill obligations to partners on the timing and volume of production (depending on different scenarios);

2
2

Lorem ipsum dolor

Whether there are enough employees to fulfill obligations to partners on the timing and volume of production (depending on different scenarios);

3
3

Lorem ipsum dolor

Whether there are enough employees to fulfill obligations to partners on the timing and volume of production (depending on different scenarios);

Annual planning often takes months, so even experienced managers cease to act rationally in a crisis situation. The optimal solution for the entire enterprise is not always optimal
for individual workshops and their managers. And there is not enough time for a qualitative analysis.

New workflow

Manufacturing has to adapt their workforce organization in consequence. On the shop floor, such measures include the following:

Lorem ipsum dolor sit amet, consectetur

keeping teams at a maximum of five
to ten people

Lorem ipsum dolor sit amet, consectetur

decoupling the start and end times
of shifts

Lorem ipsum dolor sit amet, consectetur

reorganizing the workplace layout to allow for a distance of more than five feet (1.5 meters)  between employees

Lorem ipsum dolor sit amet, consectetur

conducting shift handovers
remotely

Solution

Annual planning often takes months, so even experienced managers cease to act rationally in a crisis situation. The optimal solution for the entire enterprise is not always optimal
for individual workshops and their managers. And there is not enough time for a qualitative analysis.

Terrific.Productivity

Change Management and Operative Management
of a Production System

Speed

1. Fast generation of a digital twin

2. The model is based on a limited amount of accurate data

Optimal version of the production system

Automatic generation instead of the description  of existing non-optimal processes and errors

Addressing the system as a whole

Full understanding of cause and effect relationships: the impact of the interaction of parts and connections between them on the entire system

Low cost of ownership

Programmers and narrow specialist
are not required

Video

Video for different cases of planning (should be prepared together wit BFG)

Schedule a demo

Ideation Workhow is a great 4-hour session that can help your company boost your AI initiatives and accelerate new AI projects.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.